GeneSat1 Mission Dashboard

Mission Counter

Satellite Status Ground Segment Status

Bus Health Control Nodes

 

Power Nominal: Bus voltages all as expected;  Primary MOC   Nominal
Mission Phase Ext. Temp Nominal: Solar Panels ~ 11.8-13.1 deg C (entering eclipse) Backp MOC Nominal
Pre-Launch Int. Temp Nominal: Payload Canister as expected SRI Node- ACTIVE Nominal
Launch   CPU  Nominal: # processor resets = 0 SCU Node Nominal
Deployment Comm Nominal: 2.4 GHz functional; beacon nominal Communication Station
Stabilization Payload    SRI - operational Nominal
Experiment   Temp Anomaly: control anomalous (but no longer needed) SCU - operational Nominal
Post-Experiment   Pressure Nominal: 14.1 psi    36,000+ beacon packets from  HAMs
Event Summary
   12/16 0400 Launch
   12/16 0420 Deployment
   12/16 0530 Beacon Acquisition
   12/17 0400 2.4 GHz Acquisition
   12/18 0500 Experiment Start
   12/22 0535 Bio experiment ends
   02/21 1430 Experiment phase ends
Operational Notes
   2.4 Comm: 27% success rate, 2/13
   Beacon: Freq shift 437.0645 MHz
   883 successful command
   2.97 Mbits of data downloaded 
96-hr Optical Density
96-hr Fluorescence 
Payload Temperatures
Solar Panel Currents
Extended Optical Density
Extended Fluorescence 
Bus Temperatures 
Bus Currents

Santa Clara University Robotics Systems Laboratory

Since 1/1/07

Hit Counter